+27 64 987 3021 [email protected] Mon-Fri 8:00-17:30 (SAST)
Glass Transition Temperature Definition, How It Works

Glass Transition Temperature Definition, How It Works

Browse technical resources about ADSS/OPGW cables, 5G fronthaul, data center interconnect, and fiber optic testing.

  • How to drill holes for rivets in a distribution box

    How to drill holes for rivets in a distribution box

    Drill a hole through the materials the same diameter as your rivet. Fit your rivet gun with the nozzle that fits the rivet you're using. Pump the handle on the. In this guide, I'll walk you through everything I've learned from working with blind rivets in real-world applications—especially how they pair with CNC drilling to deliver reliable, high-speed assembly in sheet metal, machinery, and even automotive applications. Precision in riveting, especially concerning CNC rivet holes, is essential for the structural integrity. All holes shall be drilled normal (at 90 degrees) to the working surface. When drilling through more than one sheet, hold the sheets securely together so there is no misalignment of holes due to. Achieving proper hole quality for rivets and rivet nuts is essential for installation. Any burrs inside the hole or blowout on the backside (blindside) can cause the. Blind rivets, also called pop rivets, are commonly used to hold components together more efficiently and reliably than screws, bolts or nuts. They come in a variety of sizes and are widely used in electronics, aerospace, ship building and a host of other industries.

    [PDF Version]
  • How to locate a large distribution box

    How to locate a large distribution box

    Look for the distribution box near the septic tank, at the edge of the drain field, or along the outlet pipe from the tank. Check for access lids or covers in the ground, usually small, square or round, and buried 6 inches to 2 feet deep. The tank is almost always downstream from the main sewer line exiting the house, typically 10 to 25 feet away from the foundation. They're usually made of either plastic or concrete, and they have several openings on different sides where the drain field lines connect to the box. In this guide, we'll explain how to locate your distribution. This septic system inspection article explains where to look for and how to locate septic system components for any purpose such as inspection, maintenance, troubleshooting or repair, or as part of the Septic Loading and Dye Test procedure for testing the function of septic systems. Maintaining a septic system is crucial for.

    [PDF Version]
  • How to wall-mount a network server rack

    How to wall-mount a network server rack

    In this step-by-step tutorial, learn how to wall mount a network rack easily and securely – even if you're doing it solo! I cover mounting the bracket, handling design issues like tight hooks, bending tabs for a perfect fit, and securing with lag. moreWelcome to this guide on how to mount a wall server rack. Whether you're a small business owner, a home-based entrepreneur, or a tech. You've purchased a wall rack for all your network equipment. Before mounting a wall rack, the most crucial. Wall-mount racks are the most popular option for public areas. These are compact boxes that are hung to vertical surfaces with special fasteners. We will walk you through each part, step by step. The "Clean Setup" Inspiration If.

    [PDF Version]
  • How to connect the DC bus

    How to connect the DC bus

    Measure the voltage in the DC bus between the UZP / UZN terminals to ensure that the terminals are voltage-free. Use only AMK DC. The Kinetix® 5700 DC-bus link kits are used to extend DC-bus power from drive-to-drive in DC-bus multi-axis configurations. DC-bus links are rated for 208 A, maximum bus-bar current. (1) When two or three 2198-P208 DC-bus supplies are connected in parallel, one 85 mm DC-bus link is required for. This approach offers users several advantages for applications with multiple AC drives especially when they are in a coordinated system typical for motion control and production lines. Follow all safety instructions delivered with the drive. This chapter explains why and contains other useful information on what to look out for when designing a system's DC wiring. To find out how to calculate the current see the Current, cable resistance. After switching off the mains, the buffer capacitors for the DC bus can still have a charge and lead to a life-threatening DC voltage.

    [PDF Version]
  • How much space should be reserved for cables entering and exiting the distribution box

    How much space should be reserved for cables entering and exiting the distribution box

    26 (D), all working spaces must have a minimum Electrical equipment headroom of 2. 0 m (6 ft 6 in), measured from the floor or platform to the ceiling or any overhead obstruction like pipes or ductwork. This ensures a worker isn't forced to crouch or work in an awkward. Per NEC 110. While. Dedicated equipment space is for the equipment so that there is ample room for installing conduits, cables, cable trays and related wiring methods. The National Electrical Code. The National Electrical Code (NEC) governs electrical junction box rules. These rules define when you must install a box, how large it must be, how you must install it, and how inspectors evaluate compliance.


  • How to select access switch parameters

    How to select access switch parameters

    This MSAccess tutorial explains how to use the Access Switch function with syntax and examples. The Microsoft Access Switch function evaluates a list of expressions and returns the corresponding valu.


Need Product Pricing?

Contact us for competitive quotes on any of our fiber optic products

Get a Quote