+27 64 987 3021 [email protected] Mon-Fri 8:00-17:30 (SAST)
Net Technology  Computer, Networking Amp Cctv

Net Technology Computer, Networking Amp Cctv

Browse technical resources about ADSS/OPGW cables, 5G fronthaul, data center interconnect, and fiber optic testing.

  • DWDM dense wavelength division multiplexing technology

    DWDM dense wavelength division multiplexing technology

    Dense wavelength-division multiplexing (DWDM) refers originally to optical signals multiplexed within the 1550 nm band so as to leverage the capabilities (and cost) of EDFAs, which are effective for wavelengths between approximately 1525–1565 nm (), or 1570–1610 nm (). EDFAs were originally developed to replace optical-electrical-optical (OEO), which they have made pra.


  • Hot aisle in industrial computer room

    Hot aisle in industrial computer room

    The hot aisle /cold aisle data center layout was originated by IBM in 1992 and it is one of the oldest ways to save energy in the data center. 1 Hot aisle/cold aisle layout involves lining up server racks in alternating rows with cold air intakes – the fronts of servers – facing each other (the. Traditional open aisle data centres use perimeter PAC (precision air conditioning) or CRAC (computer room air conditioning) units to channel cold air up through a raised floor void via grilles positioned in front of the IT cabinets. When implemented. Assuming a computer room is configured in such a way that either is an option, hot aisle containment may be seen as the better option because it has some thermal efficiency and ride-through advantages. However, because every computer room is unique, there is no one definitive solution. To maintain thermal performance, equipment accessibility, and safety, it's essential to follow key spatial guidelines. Maximum Aisle Length: When equipment cabinets form a continuous row.

    [PDF Version]
  • Computer Network System Cabinet Dimensions

    Computer Network System Cabinet Dimensions

    Get a comprehensive guide on server rack cabinet sizes and dimensions. Understand the depth, width, and height requirements to fit your IT needs. Optimum positioning for PDUs – suitable for plugs of up to 32A. Ro it back door with Fix Easy locking. (Place serial numbers, barcodes or QR codes here to en ode and personalise your. This report provides a comprehensive analysis of network cabinet sizes, focusing on industry standards, emerging trends, and specific product segments including enterprise-grade racks and compact wall-mount solutions. This research covers the global server and network cabinet market, focusing on. The right cabinet size depends on three things: how much equipment you have now, how much space you have available, and how much room you need for future growth. The letter “U” stands for something called a rack unit. Our racks come with various options, depending on the product, including. 1. Split, perforated sheet steel rear door, multi-piece roof plate for side cable entry on both sides, open base frame, without side panels.

    [PDF Version]
  • What level of optical splitter is installed in the computer room

    What level of optical splitter is installed in the computer room

    In two-stage splitting applications, the first-stage optical splitter is often installed in an optical distribution box or a fiber-splitting box, while the second-stage optical splitter is often installed in a local residence or community closer to the end-user. Selecting the right splitter is crucial for building a reliable fiber optic network. PLC splitters are based on planar lightwave circuit technology, ensuring uniform signal distribution and supporting high split ratios up to 1×64 or even higher. They are ideal for large-scale deployments such as. The first level of splitting (1:4 or 1:8) is installed in a closure, not far from the central office.


  • Dehumidification of the hot aisle in the computer room

    Dehumidification of the hot aisle in the computer room

    Install the dehumidifier intake on the return air path (hot aisle side) where moisture content is highest. Position condensate drainage with redundant paths. As computer room air conditioning units (CRACs) were controlled to relatively low supply air temperatures, it was not uncommon for a CRAC unit to dehumidify the room air while at the same time a different CRAC unit could be in humidification mode. Such a humidity-control strategy is like. This article explains practical approaches to air conditioning for computer rooms, focusing on maintaining stable temperatures and humidity, selecting suitable systems, and implementing maintenance practices that minimize downtime and energy use. Operating above 60% RH accelerates corrosion on copper and silver contacts inside servers. Data centers generate heat every second of every day. Servers, storage equipment, network switches, UPS systems, power distribution equipment, and high-density computing racks all produce heat that must be removed continuously.

    [PDF Version]

Need Product Pricing?

Contact us for competitive quotes on any of our fiber optic products

Get a Quote